Showing posts with label Energy. Show all posts
Showing posts with label Energy. Show all posts

Sunday, May 14, 2023

More EV Analysis

 The following are some calculation regarding the EV demands and performance.

First the Blocking Probability versus offering traffic load. This is the chance that there is no available EV charger at a station. Once in say 100 or even 50 times is not bad. However half the time is a mess.

This is the required number of locations versus the offered load per site. It explodes at we demand better performance.

One wonders if anyone in DC has even considered this issue. Now the costs of this is massive! If we have 1 million sites at say 0.5 million per site we get 0.5 time 10 to the 12th. Just for site development!

Saturday, May 13, 2023

A Simple Calculation

 I did a quick calculation. Here we go. Assuming to have near zero blocking at stations we get:

Number Servers 5
Arrival Rate 0.02
Block Probability                   0.002
Holding Time 45
E 0.9




US Autos        150,000,000
Number Sites            1,953,125
 
   
Miles per Car 200
Miles per day 50
Days per charge 4
Hours per day 16
Arrival rate per car 0.000260417
Cars per site 76.8

 

To handle the cars in US with no significant delay per site you need about 2 million charging sites with 5 chargers per site! At 10,000 sq feet per site, 100x100 ft, you need 20 billion sq feet of new space! 
 

A Queuing Problem

 Queues are waiting lines. For example boarding a plane or buying coffee. Now if one has a gas powered car, the typical queues at a gas station is zero, namely you pull up to a pump and fill the tank. Why? Simple, the arrival rates are low, cars can drive long distances between fills, the number of servers or gas pumps is very large and the holding time or time to fill a tank is at best a couple of minutes.

Now if we move to electrical vehicles we have the following problem:

1. The arrival rate is high due to low distance capacity of batteries. Namely a gas vehicle goes say 400 miles on a tank, 18 gallons and say 25 mpg.

2. The holding time is at least an order of magnitude longer. Typically 45 minutes with a fast charger or 8 hours if a slow charger.

3. Thus having the arrival rate, holding time we can find the number of servers needed for zero queue length. 

The answer is staggering. We need millions of charging stations to assure an available one for every car without any delay. 

It is clear that no one has analyzed this simple problem. The DC characters are totally clueless and have not even examined the simple ones. This also opens up the need for a dramatically expanded grid, redundancy, security etc. 

For those of us who lived through the oil embargoes of the 70s they will seem like the good old days!

Thursday, February 23, 2023

Waking Up!

 The NY Times has a piece on the complexities of adding "green" power to the grid. They note:

In the largest grids, such as those in the Midwest or Mid-Atlantic, a regional operator manages the byzantine flow of electricity from hundreds of different power plants through thousands of miles of transmission lines and into millions of homes. Before a developer can build a power plant, the local grid operator must make sure the project won’t cause disruptions — if, for instance, existing power lines get more electricity than they can handle, they could overheat and fail. After conducting a detailed study, the grid operator might require upgrades, such as a line connecting the new plant to a nearby substation. The developer usually bears this cost. Then the operator moves on to study the next project in the queue.

 We have been arguing this for years. The current grid was never designed to work this way. Power companies have at best a 19th century mind set, central generating and tree and branch network. If a branch fails, too bad.

If the Greens demand all electric we will experience a horror show. The network will fail, it will lack capacity, and the costs will be unbelievable.

We had US Department of Energy people whose sole purpose is to regulate and pontificate. They lack any technical competence, except the weapons folks. No one has thought through this, and especially at the Secretary level we have just religious zealots which may very well result in total collapse.

Wednesday, May 6, 2015

Battery Waste?

Batteries have been useful but not the most efficient storage medium for energy. However with the introduction of lithium batteries this has improved. However lithium is hazardous waste. A rechargeable battery can go through a recharge cycle a few thousand times at best. If you do it every day, as in a home system, then you may get three to four years of use. Then you have a non-rechargeable toxic boat anchor. Where do you put it? Not as bad as nuclear waste but definitely not "green".

Along comes Tesla who announces a home battery (see the CSM):

All of the new batteries run on the same type of lithium-ion, software-equipped technology found in Tesla's cars, and can be mounted inside or outside of a building.

As Computer World notes:

Europeans have a dimmer view of landfilling lithium ion batteries. "There is always potential contamination to water because they contain metals," says Daniel Cheret, general manager at Belgium-based Umicore Recycling Solutions. The bigger issue is a moral one: the products have a recycling value, so throwing away 2 billion batteries a year is just plain wasteful - especially when so many American landfills are running out of space. "It’s a pity to landfill this material that you could recover," Charet says. He estimates that between 8,000 and 9,000 tons of cobalt is used in the manufacture of lithium ion batteries each year. Each battery contains 10 to 13% cobalt by weight. Umicore recyles all four metals used in lithium ion batteries. 

 As Waste Management World has noted, there is a recyclable option, albeit costly:

With lithium recycling in its infancy, there is currently no main recycling infrastructure in the world that treats only automotive Li-ion batteries. A few pilot plants, such as Umicore's Hoboken plant in Belgium that are at a demonstration stage exist. Lack of standardisation in battery chemistries and changing landscape with respect to different elements under research for battery production other than lithium have made evaluation of the recycled value of the components uncertain for the recyclers.

Overall one should look at the full life cycle here. The "green" puffery is just that unless the plan to recycle safely is in place. Otherwise we will have mountains of un-usable trash!

Monday, November 12, 2012

My Phone Works, Where is my Electricity?



During the hurricane, at every instance, my land line telephone worked. Dial tone, calls, in and out, no problem. But within minutes of the start of the storm, down went the power. Heavy dew or fog knocks out the electricity. Why?

They work over the same telephone poles, they both come from central stations, they both are wires, they both require power sources, and they both have repair trucks. So why?

Simple, you see that the telephone network is changing by the day, we now have broadband, wireless, sophisticated communications devices, world wide networks, and the list goes on. Power production and distribution has frankly not changed one bit in almost 150 years! They still use the same generators, same wires, same poles, same transformers, and frankly the same sockets. 

 One of the reasons is education. We have thousands of highly skilled telecom engineers, making changes to modulation, multiple access, network management, protocols. We have hundreds of universities educating them, and the industry absorbs them at a premium. Yet when was the last time we had a PhD in power engineering? MIT no longer teaches it, it has not taught it since before 1960 to my memory. I found this out when I took a Doctoral written exam at Northwestern, just to try it, and they did there, DC motors and power transmission lines. But I suspect that 1966 was the last time they did that. They even had vacuum tubes, but alas that was the end of that as well.

We just have no quality power types, no high tech capability in an entire industry. I remember back in the 50s, if you were smart you tried to get to Bell Labs or ATT, if you were a slacker you went to Con Ed.

Thus the key problem is that the industry has no R&D, no place for smart innovative people, and it seems to be managed by “managers” whose best talents are in keeping the maximum rate of return for a utility.

The industry is shameful for its long lack of investing in high tech solutions. The national grid network is an example. It is on a par with water distribution or sewer pipes.  Can Government do anything? The answer is also a simple, no! Just look at DoE, since the early 1970s it has wasted hundreds of billion on electric cars. Sound familiar. Then batteries, then solar.  It is clear that there is a major set of challenges, but to meet them will require a major upheaval of the utility mindset, the mindset that seems to see it fine to have tens of millions sent to the darkness while the dial tone still work.

Thursday, April 21, 2011

Energy, NASA, the Academy, the Entrepreneur and the Future

Energy, NASA, the Academy, the Entrepreneur and the Future; what do these have in common? In talking with an old friend of mine whose early career was at NRL and then NASA, and who in many ways is the quintessential engineer, I remember the days on the late 50s and early 60s with the space race when NASA and DoD funded many graduate students and the management of these agencies were in many cases the folks who came out of WW II. They were dedicated devoted and driven. The early NASA teams, before Johnson turned it into a political hack factory, were very bright folks and could always find ways to solve engineering problems.

Now the energy problem is hard but doable. It is somewhat akin to separating uranium in 1942, many options, not knowing the best, but the science of separation was understood, it became a big chemical engineering issue. It got solved.

Now the energy problem has been driven by DoE, not one of the swiftest parts of the Federal Government, if I remember Carter had appointed a dentist at its head at one time. You see DoE rally makes bombs, the old Atomic Energy Commission, and it spends billions on other stuff, including electric cars which goes back to the early 70s at least. Nothing has ever come out of this mess. Unlike the early days of NASA, or the Manhattan Project, it became a Government institution with no well defined and targed goal.

But energy alternatives is well defined. NASA did work early on, the Academy is a place to start, and the Academy produced may of the entrepreneurs. You see I had a 64K memory computer on the Apollo capsule to integrate my star tracker into, yes 64K, not 64G, a million times less. That meant you really had to think.

From this amalgam of really smart people and a really good Government agency, we solved some really hard problems. Instead, today we send our entrepreneurs to Facebook, another web based sale approach, which may have the ability to provoke social change but the "value" of that change is problematic. After all people spend tons of time tweeting, facebooking, and the like. I got rid of my Facebook stuff, it was just too dumb. My MIT students had me sign up early on but after a few years I made a value judgement, it was negative. I relly dd not care what my nephew ate last night for dinner! Now I really like my nephew, but it just went too far.

So back to energy, leadership in Washington, focus, the right motivation, and I think we can make great progress. But first, move DoE to, well, West Virginia, south of Morgantown. Far enough away but close to CMU, WVU and a few others. In the coal belt, motivate folks. It has been done before, it can be done again.

Sunday, January 9, 2011

BP & Alaska: Loss of Production

BP has just announced a loss of its oil production in Alaska. The FT states:
Oil markets were braced on Monday for the impact of the loss of up to 15 per cent of US crude after a pipeline leak forced BP, the UK-based oil company, to shut down 95 per cent of production from North America’s biggest field...The development, at the Trans-Alaska Pipeline System that carries oil from the Prudhoe Bay field, comes as BP is still grappling with the fallout from the oil spill in the Gulf of Mexico. A prolonged shutdown would cut into BP’s output and could undermine earnings.

They continue:


The pipeline carried an average of 642,261 barrels per day in December, higher than the monthly average last year of 620,000 barrels...The Marine Terminal at Valdez has 18 storage tanks, with total capacity of more than 9m barrels. But only 14 of those tanks are in operation. On Sunday morning, Alyeska said they still held 35 per cent of their inventory, or about 2.5m barrels of oil. There is no significant storage on site to make up for a prolonged outage..

This will most likely send shakes throughout the US economy as well. One wonders what types have been managing BP.